Skip to content
ICC-CI — International Concrete Company
Production site, industrial frame.

Industrial site

8,389 m² organised for production.

At PK 44 on the northern highway, the site is designed as a complete asset: to direct, to store, to manufacture, then to hold products until maturity.

8,389m²

Location

PK 44, northern highway, Côte d’Ivoire

01

Administration

An administrative office to run the activity.

02

Materials

A storage area for raw materials.

03

Production

A manufacturing zone fitted with metallic formwork.

04

Finished goods

A storage area through to maturity and delivery.

Production sequence

  1. 01Raw materials
  2. 02Preparation
  3. 03Moulding
  4. 04Vibration
  5. 05Demoulding
  6. 06Curing
  7. 07Storage
  8. 08Delivery

Situation plan

The map will be shown once coordinates are confirmed. The published address remains that of the file: PK 44, northern highway.

  1. 01

    Raw material selection

    Cement, aggregate, washed lagoon sand and reinforcing steel, available in Côte d’Ivoire.

  2. 02

    Concrete preparation

    A dosage of approximately 400 kg/m³ for electrical poles.

  3. 03

    Moulding

    Casting in metallic formwork.

  4. 04

    Vibration

    Vibration in the mould to achieve compaction.

  5. 05

    Initial hardening

    Approximately 24 hours before poles are demoulded.

  6. 06

    Demoulding

    Release from the formwork, or immediate demoulding for pressed blocks.

  7. 07

    Curing

    Approximately 28 days for poles to reach maturity. Up to 7 days for blocks.

  8. 08

    Inspection

    Check before release. Target strength of approximately 35 MPa for poles at maturity.

  9. 09

    Delivery

    Transport to site once maturity has been reached.

An infrastructure project to review.